Apartments in La Altagracia | APARTMENT PROJECT NEAR THE BEACH, IN TIP CANA
Location
La Altagracia
Published
22/10/2024
Price/m² of construction
$2,500
Details
The Project consists of 2 buildings of 19 units each with a total of 38 apartments of 1 room, each with an area of approximately 50 m2 to 57 m2.
In rooftop there are a total of 30 storage/locker of 8 m2. “All units are delivered furnished and with white line”
UBICATION:
In the heart of Bavaria – Punta Cana, El Cortecito is the most consolidated tourist pole in the eastern part of the Dominican Republic. Sausalito is located to:
• 12 minutes walking to Playa Bávaro
• 5 to 10 minutes to shops, restaurants and supermarkets.
• 25 minutes International Airport of Punta Cana
CHARACTERISTICS:
• Spacious and bright spaces to enjoy the Caribbean climate
• Reception
• Contemporary Design
• Easy access for all conditions
• Direct elevator access
Acknowledgements:
• Swimming pool/Solar
• Gym
• Lobby
• Coffee shop
• Security
• Elevator
COCINAS INCLUDING:
• You know what?
• Fridge
• Horn
• Water heater
• Extractor
PAGO PLAN:
• BOOK: UD$3,000
• SEPARATION: 20% (Contracting agreement)
• HOME: 40% during construction
• AGAINST ENTREGA: 40%
In rooftop there are a total of 30 storage/locker of 8 m2. “All units are delivered furnished and with white line”
UBICATION:
In the heart of Bavaria – Punta Cana, El Cortecito is the most consolidated tourist pole in the eastern part of the Dominican Republic. Sausalito is located to:
• 12 minutes walking to Playa Bávaro
• 5 to 10 minutes to shops, restaurants and supermarkets.
• 25 minutes International Airport of Punta Cana
CHARACTERISTICS:
• Spacious and bright spaces to enjoy the Caribbean climate
• Reception
• Contemporary Design
• Easy access for all conditions
• Direct elevator access
Acknowledgements:
• Swimming pool/Solar
• Gym
• Lobby
• Coffee shop
• Security
• Elevator
COCINAS INCLUDING:
• You know what?
• Fridge
• Horn
• Water heater
• Extractor
PAGO PLAN:
• BOOK: UD$3,000
• SEPARATION: 20% (Contracting agreement)
• HOME: 40% during construction
• AGAINST ENTREGA: 40%