Puerto Plata | Residencial Costambar Gold - 1574
$325,000
- Price
- $325,000
- Lot Size in m²
- 315
Location
Puerto Plata
Published
12/04/2024
Price/m² of land
$1,031
Details
Spectacular project of 18 Villas in front of the Golf Course “Residencial Costambar Gold” takes the opportunity to have yours in a quiet space with the beach 5 minutes and mountain view
Description:
325 meters of land and 215 meters of construction
3 bedrooms the main room with its bathroom inside and walkin-closet
2 bathrooms and a half
Double Marquise
Swimming pool
Terrace
Living room
Structure:
The floor to ceiling height is 3.00 m on the ground floor and on the second floor 3.00 m.
Increase:
The construction system of the building is based on the base system of shoes isolated from concrete and masonry shoe.
Zapata: Steel, concrete and hardwood
The facilities will be made with the following materials:
Hydraulic installation: P.V.C. pipe.
Sanitary installation: P.V.C. sanitary pipe
Electrical Installation: Conduit pipe thick wall, cable according to standards
Paredes y Pisos:
Walls: 8-storey blocks and 6-story blocks on the second floor
Flats: porcelanato Brasil and also the bathrooms with its walls
Windows: sliding windows with traditional crystals
Doors: In Melamina
Furniture:
A bed upholstered in each of the 60’’ wide rooms.
An air conditioning in each room of 12,000 BTU.
A 6 chair mahogany dining game, with the glass top.
A two-unit upholstered furniture game.
A built-in stove and a 12-foot fridge.
Payment form
10% - Separation
20% - At the beginning of the construction
30% - When the work is at the second level
30% - When it is at the installation level of doors and windows
10% - Delivery of property and title. (6 Months)
Description:
325 meters of land and 215 meters of construction
3 bedrooms the main room with its bathroom inside and walkin-closet
2 bathrooms and a half
Double Marquise
Swimming pool
Terrace
Living room
Structure:
The floor to ceiling height is 3.00 m on the ground floor and on the second floor 3.00 m.
Increase:
The construction system of the building is based on the base system of shoes isolated from concrete and masonry shoe.
Zapata: Steel, concrete and hardwood
The facilities will be made with the following materials:
Hydraulic installation: P.V.C. pipe.
Sanitary installation: P.V.C. sanitary pipe
Electrical Installation: Conduit pipe thick wall, cable according to standards
Paredes y Pisos:
Walls: 8-storey blocks and 6-story blocks on the second floor
Flats: porcelanato Brasil and also the bathrooms with its walls
Windows: sliding windows with traditional crystals
Doors: In Melamina
Furniture:
A bed upholstered in each of the 60’’ wide rooms.
An air conditioning in each room of 12,000 BTU.
A 6 chair mahogany dining game, with the glass top.
A two-unit upholstered furniture game.
A built-in stove and a 12-foot fridge.
Payment form
10% - Separation
20% - At the beginning of the construction
30% - When the work is at the second level
30% - When it is at the installation level of doors and windows
10% - Delivery of property and title. (6 Months)